久久久久网站_伊人色网_给我免费观看视频_a级一级片

DC engineering
±500kV Yihua Line anti-dancing renovation project

宜華線.jpg

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

電 話
產(chǎn) 品
短 信
聯(lián) 系